Sign In | Join Free | My xuijs.com
China Qingdao Huashida Machinery Co., Ltd. logo
Qingdao Huashida Machinery Co., Ltd.
Pipeline Anticorrosion Thermal insulation Pipe production lineMACHINERY MANUFACTURER
Verified Supplier

2 Years

Home > Pre-Insulated Pipe Production Line >

110-550mm PE Insulation Pipe Extrusion Line Automatic Tube Cutting

Qingdao Huashida Machinery Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

110-550mm PE Insulation Pipe Extrusion Line Automatic Tube Cutting

  • 1
  • 2
  • 3

Brand Name : Huashida

Certification : ISO9001

Place of Origin : Qingdao,Shandong,China

MOQ : 1

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Delivery Time : 2months

Packaging Details : according to the actual condition

Cutting Method : Planeatry Cutting

Diameter Range : 110-550mm

Plc : Siemens

Product Color : Black

Cutting Device : Planetary cutter

Contact Now

110-550mm PE Insulation Pipe Extrusion Line,Automatic tube cutting

gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery

Technical Prameters:

PE-365/760 PE-420/960 PE-850/1372 PE-960/1680
Main extruder SJ-90/33 SJ-90/33 SJ-120/33 SJ-150/33
Pipe diameter (mm) Φ365-960 Φ420-960 Φ850-1372 Φ960-1680
capacity (kg/h) 550-700 550-700 700-900 800-1200
Installed power (kw) 360 380 440 580
Length (m) 35 36 40 48

The huashida insulation pipe production line boasts a core technology that stands at the forefront of China's industry. It showcases numerous innovative points and design concepts, effectively bridging gaps in domestic capabilities. Notably, four pioneering core technologies—the solid-liquid phase separation screw, spiral diverter head, DCL human-machine dialogue technology, and real box external manipulator technology—are either the first or among the earliest implemented in the sector. This groundbreaking product stands as the sole domestic production line capable of producing 1880mm large-diameter insulation pipes, further solidifying its position as a leader in the field.


110-550mm PE Insulation Pipe Extrusion Line Automatic Tube Cutting

HDPE Jacket Process Flow:

Vacuum feeding PE granule-->hot air dry material-->extrusion plasticizing-->mold shaping-->Vacuum sizing-->water cooling-->Pulling out-->cutting pipe-->carrier laying-off pipe

Composition of Equipments:

1.hopper dryer ⒉ Single Screw Extruder ⒊ extrusion mould die ⒋ Head bracket ⒌ Vacuum calibration device ⒏ Water cooling tank ⒐ haul-off ⒑ Planetary cutting machine 11.Pipe bracket ⒓. Loader 13. PLC

PU Foaming Pre-insulated Pipe Production process Flow:

The production process of "pipe in pipe" (PU Foaming Pre-insulated Pipe) mainly includes three steps: surface pretreatment of steel pipe, production of HDPE outer protective pipe and production of insulation layer.

110-550mm PE Insulation Pipe Extrusion Line Automatic Tube Cutting


The production steps of insulation layer are as follows: firstly, the steel pipe is penetrated into the high-density polyethylene outer protection pipe to form a casing structure, and the supports are evenly arranged in the annular space between the steel pipe and the high-density polyethylene outer protection pipe, and the two ends are sealed by flanges; secondly, the casing is hoisted on the foaming platform, and the polyurethane foaming material is injected into the casing by high-pressure foaming machine; finally, the polyurethane material is foamed After curing, the sealing structure at both ends is removed to complete the production process of the insulation layer.

Rigidity due to the presence of strong ties between the steel pipe layer polyurethane insulation and jacket pipe and provides pre-shot blast or blast cleaning the surface of the steel pipe, optimum performance polyurethane insulation, corona surface of polyethylene pipe shell.
110-550mm PE Insulation Pipe Extrusion Line Automatic Tube Cutting
gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery Advantages:
Significantly increases the reliability of the pipeline in the PUF insulation system operational availability of remote condition monitoring PUF insulation, which allows to detect and repair leaking coolant, preventing accidents typical for thermal networks of other designs.
Highly cost-effective use of pipelines in the foam insulation define the following parameters:
Simplifying the construction, maintenance and repair;
Increased service life of 30-40 years (traditional types of pipelines - 5-10 years);
Reduction of heat losses to 8% (traditional types of pipelines - 30-40%);
Reducing capital costs by 15-20% (not required construction of concrete channels and chambers for valves);
Reduced operating costs by 9 times;
Reduction in repair costs 3 times.


Product Tags:

Pre Insulated Steel Pipe Production Line

      

Pre Insulated Pipework Production Line

      

Pre Insulation Pipe Production Line

      
Best 110-550mm PE Insulation Pipe Extrusion Line Automatic Tube Cutting wholesale

110-550mm PE Insulation Pipe Extrusion Line Automatic Tube Cutting Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Huashida Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0